The Barebasement process
-
Initial meeting in which a Barebasement representative accesses the basement size and condition. A discussion will be held on the general layout and finish objectives.
-
A follow-on meeting is scheduled at which time a cost is provided.
-
Upon a decision to proceed a blueprint is commissioned with a design fee of $500 required. This fee is non-refundable since design time is required to move to the next step however it will be applied as a deposit against the final project cost.
-
A final price is presented and the Barebasement project agreement is signed.
-
The project is scheduled in coordination with homeowner on access availability.
-
Permits are obtained from local government.
-
Construction begins with the framing of walls and bulkheads.
-
Mechancials are installed; Heating, Plumbing, Electrical.
-
Inspections are conducted.
-
Insulation.
-
Further inspections.
-
Drywall installation and finishes.
-
Optional finishes are installed.
-
Basement is cleaned.
-
Final inspections.
-
Final homeowner inspection with construction manager.
-
Project complete.